Karot Hydropower Project in Pakistan
Karot Hydropower Project Scope of Work: Geotechnical Investigation IVCC was involved in drilling of 13 Boreholes with depths from100-130 meters, using Straight Rotary Machines in weathered and fresh rock obtaining continuous samples using double tube coring equipment. Total drilling [...]
Haveli Bahadur Power Project 2017
Haveli Bahadur Power Project: 1100-1400 MW RLNG Based Combined Cycle Power Plant (2017) Piling Work IVCC constructed 3 Piles of 760 mm diameter with maximum depth of 30.35 meter. Total Drilling footage 80 meters. 3 Pile Load Tests of 750 [...]
Mahl Hydropwer Project in Pakistan under CPEC 2016
Mahl Hydropwer Project in Pakistan: Proposed 590 MW on Jhelum River & Mahl River at the border of AJ&K and Punjab Province. Geotechnical Investigation IVCC drilled 52, vertical and inclined, Boreholes. These had a maximum depth of up to 235 [...]